JR Davis Construction Home Projects Estimating Employment Contact Us
Projects
Featured Projects  *Current Projects*  Completed Projects
Roadway Projects   Residential Projects   Commercial Projects

John Young Parkway Widening Orange County

  • Year: 2012
  • Client: Orange County BOCC
  • Location: Orlando
  • Contract Amount: $18,324,582.00
  • Details: Widening of John Young Parkway from Beachline (SR 528) to the North Approach Slab to the Florida's Turnpike
 

Poinciana Parkway

  • Year: 2014
  • Client: Osceola County Expressway Authority (Jr Davis Const-UIG Poin
  • Location: Kissimmee-Poinciana
  • Contract Amount: $68,788,000.00
  • Details: Design Build; 9.66 miles Roadway with tolled bridge and related roadway components; partially over wetland areas from Cypress Parkway to 17-92
 

Osceola Parkway Ph II

  • Year: 2014
  • Client: Turner Construction-Osceola County
  • Location: Kissimmee
  • Contract Amount: $11,891,900.00
  • Details: 2.22 miles roadway widening from Buenaventura to Boggy Creek
 

Martin Luther King Ph III

  • Year: 2014
  • Client: City of Kissimmee - TWA
  • Location: Kissimmee
  • Contract Amount: $6,287,633.00
  • Details: 1.35 miles of new road construction from Thacker Ave. to Dyer Blvd. and utility adjustments
 

Buena Vista Drive Widening

  • Year: 2014
  • Client: Reedy Creek Improvement District
  • Location: LAKE BUENA VISTA
  • Contract Amount: $41,310,070.00
  • Details: The Scope of the Project includes the reconstruction and widening of Buena Vista Drive from Hotel Plaza Boulevard to Bonnet Creek Road. The reconstruction will provide dedicated concrete bus lanes from Bonnet Creek to Intersection 2 and other privately owned vehicle lane improvements. In addition, the reconstruction of the road will require: (i) the reconstruction of the bridge over the L101 Canal; (ii) the reconstruction of the storm drain systems; (iii) the relocation and realignment of many of the utility systems; (iv) the reconstruction of traffic signal systems at six intersections; (v) the reconstruction of the roadway lighting systems; (vi) the reconstruction of the roadway signage and graphics; and (vii) the redevelopment of the landscape and irrigation systems.
 

Barnes Boulevard Widening

  • Year: 2014
  • Client: Brevard County Board of County Commissioners
  • Location: Melbourne
  • Contract Amount: $21,200,000.00
  • Details: Project consists of widening of existing two lane to four lanes with center median from the intersection of Fiske Blvd to just east of the intersection with Murrell Rd. the project length is approximately one mile, and also includes two large retention areas outside of the Barnes Blvd R/W limits. Major items of work include clearing and grubbing, earthwork, waterline, sewer line and reuse line relocation, drainage pipe installation, sidewalk and roadway construction and mast arm traffic signalization.
 

FDOT T5516 192 - EASTERN TO NOVA

  • Year: 2015
  • Client:
  • Location: ST. CLOUD
  • Contract Amount:
  • Details: Widening US 192 from Eastern Ave. to Nova Road from four to six lanes, includes drainage improvements, signing and pavement markings, milling and resurfacing and shoulder pavement.
 

FDOT T5530 192 FROM AERONAUTICAL TO BUDINGER

  • Year: 2015-2018
  • Client: FDOT
  • Location: SAINT CLOUD
  • Contract Amount: $37,673,821.00
  • Details: DESCRIPTION: The improvements consist of widening from rural 4 lane to high speed urban 6 lane with 2 bridges including 5’ sidewalks on north and south sides of the roadway along SR 500 (US 192).
 

Click here to go back to previous page